Project Description

Client:

Confidential

End User:

Mubadala Petroleum

Project:

15,000 BPD Produced Water Compact Flotation Unit (CFU)

Year:

2018

Location:

Offshore Thailand

Scope:

Tender Preparation
Technical Clarifications
Skid Detailed Design Engineering
Project Management
Fabrication Management
Installation & Commissioning Support

Services Provided:

Equipment Sizing
Complete set of PFDs
Complete set of P&IDs
Complete set of Datasheets
Skid General Arrangement Drawing
Preparation of Project Schedule
Preparation of Specifications
Preparation of RFQs
Preparation of Cost to Build
Preparation of Vendor Bid Evaluation
Preparation of Operating Philosophy
Participation in Hazop and closeout of Hazop actions
Preparation of FAT Procedure
Preparation of O&M Manual
Installation and Commissioning Off-Site Support
Proposal and Project Management from Tender Preparation to First Oil